Three-point estimating is one of the techniques in the management of a project to increase the precision of estimating durations or costs in the completion of a task by adding the dimension of uncertainty or potential risk. Three-point estimates include the following.
 

Optimistic (O): What may happen if all goes right
Pessimistic (P): In case the worst thing happens, consider challenges that may appear.
Most Likely (M): In case things happen according to normal standards.
 

The formula used in giving the final estimate is:

Estimate=6(O+4M+P)​

It will lead to a weighted average and, therefore, support better planning and control of project expectations.

For Example:

Let's say you estimate the number of days it would take to finish a design activity for a given project.

Optimistic (O): If all goes well, the task could be completed in 3 days.
Negative (N): Assuming that all the delays are significant, then it would take them about 9 days.
M Most Likely: In the typical probability, it would take about 5 days.

Using the Three-Point Estimating formula:
Estimate=(O+4M+P)6\text{Estimate} = \frac{(O + 4M + P)}{6}Estimate=6(O+4M+P)​
Adding the values:
Estimate=(3+4×5+9)6=(3+20+9)6=326≈5.33 days\text{Estimate} = \frac{(3 + 4 \times 5 + 9)}{6} = \frac{(3 + 20 + 9)}{6} = \frac{32}{6} \approx 5.33 \text{ days}Estimate=6(3+4×5+9)​=6(3+20+9)​=632​≈5.33 days

answered Oct 30 by Ali

Related Questions In PMP

0 votes
1 answer
0 votes
1 answer

What is PMBOK guide in project management?

Certainly! PMBOK stands for "Project Management Body ...READ MORE

answered Sep 25, 2023 in PMP by Edureka
• 12,690 points
509 views
0 votes
1 answer

Which is the best project manager certification?

Although there are many certifications available that ...READ MORE

answered Jul 22, 2020 in PMP by Sirajul
• 59,230 points
766 views
0 votes
1 answer

What is the best path to become a Project Manger?

Assuming you don't have sufficient experience, Here are ...READ MORE

answered Jul 22, 2020 in PMP by Sirajul
• 59,230 points
764 views
+1 vote
1 answer

How do I become a Project manager with no experience?

Since you don't have any prior experience ...READ MORE

answered Jul 22, 2020 in PMP by Sirajul
• 59,230 points
834 views
0 votes
3 answers

Which is the best project management software?

Today, with the evolving technology, every project ...READ MORE

answered Jul 27, 2020 in PMP by GurwinderKaur
• 380 points
750 views
0 votes
1 answer

What are the biggest challenges in adopting Agile methodologies?

The biggest challenges in adopting Agile methodologies ...READ MORE

answered Nov 5 in PMP by Ali
32 views
0 votes
1 answer

Who is the father of the project method of teaching?

William Heard Kilpatrick is the father of ...READ MORE

answered Nov 5 in PMP by Zaid
26 views
webinar REGISTER FOR FREE WEBINAR X
REGISTER NOW
webinar_success Thank you for registering Join Edureka Meetup community for 100+ Free Webinars each month JOIN MEETUP GROUP